• Thumbnail for RABe 520
    The RABe 520 is an electric multiple unit used since 2002 by the Swiss Federal Railways. It is based on the Stadler GTW 2/8 model. The drive module at...
    4 KB (238 words) - 15:58, 20 December 2023
  • Thumbnail for Stadler FLIRT
    original on 12 February 2013. Retrieved 17 February 2013. Bruno Lämmli. "SBB CFF FFS RABe 521 – 524" (in German). Archived from the original on 1 March 2009...
    88 KB (7,962 words) - 20:21, 16 November 2024
  • Thumbnail for Swiss Federal Railways
    Swiss Federal Railways (German: Schweizerische Bundesbahnen, SBB; French: Chemins de fer fédéraux suisses, CFF; Italian: Ferrovie federali svizzere, FFS)...
    39 KB (4,066 words) - 06:26, 26 October 2024
  • Thumbnail for Seetal railway line
    and other traffic to operate. Passenger services are operated by the SBB RABe 520, a 2.7 m (8 ft 10 in) wide, four section variant of the Stadler GTW train...
    7 KB (850 words) - 23:40, 27 October 2024
  • bought by the SBB-CFF-FFS and leased to BLS Lötschbergbahn Ce 6/8II RABe EC Re 460 052 RBDe 560 Am 841 000 Am 843 Ae 4/7 RABe 522 ETR 610 SBB Eb 3/5 Swiss...
    40 KB (167 words) - 02:11, 5 November 2024
  • Thumbnail for Zurich S-Bahn
    the canton of Zurich and Swiss Federal Railways (SBB CFF FFS), the owner of most of the railways. The SBB CFF FFS had insufficient resources for a substantial...
    36 KB (3,055 words) - 12:56, 13 November 2024
  • Thumbnail for KTX-Eum
    2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
    17 KB (1,066 words) - 19:29, 16 November 2024
  • Thumbnail for High-speed rail in Portugal
    entire track is fully operational. ECO (2024-04-16). "CP prevê custo de 520 milhões de euros com compra de 16 comboios para a Alta Velocidade". ECO (in...
    15 KB (1,609 words) - 15:28, 12 November 2024
  • Thumbnail for Southeast High Speed Rail Corridor
    began in 2010 under the Piedmont Improvement Project (PIP), funded by a $520 million grant under the 2009 ARRA stimulus. The PIP projects included restoring...
    45 KB (4,247 words) - 00:59, 26 October 2024
  • Thumbnail for TCDD HT65000
    2, 4 (ICx) KTX-Eum New Pendolino Renfe Class 120, 121, 130 Sapsan SBB RABe 501, RABe 503 Shinkansen Series 200, 300, 700, 800, E2, E3, E7/W7 TCDD HT65000...
    6 KB (515 words) - 19:08, 20 January 2024