• Thumbnail for Incremental launch
    Incremental launch is a method in civil engineering of building a complete bridge deck from one abutment of the bridge only, manufacturing the superstructure...
    4 KB (414 words) - 14:55, 4 September 2024
  • Thumbnail for Iterative and incremental development
    Iterative and incremental development is any combination of both iterative design (or iterative method) and incremental build model for development. Usage...
    19 KB (2,238 words) - 17:45, 5 July 2024
  • Thumbnail for Incremental game
    An incremental game, also known as a clicker game, tap game or idle game, is a video game whose gameplay consists of the player performing simple actions...
    20 KB (2,325 words) - 19:12, 13 October 2024
  • Thumbnail for Incremental search
    In computing, incremental search, also known as hot search, incremental find or real-time suggestions, is a user interface interaction method to progressively...
    10 KB (1,012 words) - 05:05, 7 October 2024
  • Thumbnail for Sea Cliff Bridge
    region of New South Wales, Australia. The balanced cantilever and incremental launching girder bridges link the coastal villages of Coalcliff and Clifton...
    13 KB (914 words) - 21:46, 19 September 2024
  • Thumbnail for SpaceX Starship
    "30X". As of 2024, Starship is in development with an iterative and incremental approach, involving test flights of prototype vehicles. As a successor...
    159 KB (16,822 words) - 07:56, 27 October 2024
  • Thumbnail for Space Shuttle program
    dollars), based on marginal or incremental launch costs, and assuming a 65,000 pound (30 000 kg) payload capacity and 50 launches per year. A more realistic...
    62 KB (8,073 words) - 20:11, 4 October 2024
  • Thumbnail for Multiple rocket launcher
    multiple rocket launcher (MRL) or multiple launch rocket system (MLRS) is a type of rocket artillery system that contains multiple launchers which are fixed...
    14 KB (1,751 words) - 23:56, 28 October 2024
  • Thumbnail for Konkan Railway zone
    were cast on riverbanks itself and launched with pontoon-mounted cranes. This was India's first use of incremental launch bridge-building. The greatest challenge...
    38 KB (3,999 words) - 19:28, 15 October 2024
  • Thumbnail for Mount Edgecombe Interchange
    Phoenix.[citation needed] A key feature of the project is its two incrementally launched bridges: one, spanning 948 meters, connects the Mount Edgecombe...
    5 KB (487 words) - 23:24, 28 October 2024