• Thumbnail for Jebba Hydroelectric Power Station
    The Jebba Hydroelectric Power Station, also Jebba Power Station, is a hydroelectric power plant across the Niger River in Nigeria. It has a power generating...
    8 KB (570 words) - 09:14, 27 December 2023
  • power station is located between Shiroro Hydroelectric Power Station (upstream) and Jebba Hydroelectric Power Station (downstream). Zungeru HPP is a large...
    13 KB (1,098 words) - 20:22, 25 June 2024
  • feasibility study and design of the Diamer-Bhasha Dam, and Jebba Hydroelectric Power Station respectively. The company was also involved in the ill-fated...
    5 KB (374 words) - 09:58, 11 March 2024
  • early 2014, thermal power plants (gas-fired plants) dominate the Nigerian power supply mix. Electricity production from hydroelectric sources (% of total)...
    19 KB (396 words) - 08:17, 20 October 2023
  • Thumbnail for Kainji Dam
    deflator figures follow the MeasuringWorth series. "Sarafinchin / Kainji and Jebba Dams, Niger River, Nigeria". Retrieved 2023-07-20. Simwa, Adrianna (2018-05-04)...
    8 KB (647 words) - 17:34, 2 February 2024
  • capacity was 5600 MW in 2001, the power generated fell as low as 1750 MW. The hydropower plants in Kainji, Shiroro, and Jebba tend to have higher capacity...
    18 KB (1,628 words) - 15:17, 31 March 2024
  • Thumbnail for Energy in Nigeria
    Mambilla power plant is the biggest hydroelectric power station but is still under construction. Eleven (11) of the twenty-eight power stations are privatized...
    53 KB (5,434 words) - 06:09, 4 June 2024
  • Thumbnail for National Commission for Museums and Monuments
    Q26235290 Upload Photo Relics Of The Steamer “dayspring” Jebba Hydroelectric Power Station Kwara State Q26235289 Upload Photo Old West African Frontier...
    24 KB (412 words) - 09:09, 26 April 2024
  • Thumbnail for Niger State
    Nigeria's major hydroelectric power stations, the Kainji Dam and Shiroro Dam, are located in Niger State, along with the new Zungeru Dam. The Jebba Dam straddles...
    21 KB (1,355 words) - 06:30, 27 June 2024
  • Thumbnail for Oji River
    1960 and the commissioning of the large National Hydroelectricity power station in Kainji Dam/Jebba Dam. It was built to produce 10MW Capacity of Electricity...
    7 KB (484 words) - 06:46, 25 April 2024