are introduced in its OYQ-9 combat direction system as Aegis Weapon System (AWS). And OYQ-103 ASW combat systems, based on OYQ-102 of Kongō class and...
11 KB (813 words) - 10:10, 18 August 2024
data via Link-11, which the OYQ-5 does not support. Later, all OYQ-6 systems were upgraded to the OYQ-7, integrated with the OYQ-101 ASW Direction System...
11 KB (750 words) - 04:34, 7 July 2024
(35 mph; 56 km/h) Complement 165 Sensors and processing systems OYQ-9 CDS (w/ Link-11) OYQ-103 ASWCS FCS-2-31 fire-control systems OPS-24B air search radar...
6 KB (399 words) - 13:10, 25 October 2022
(56 km/h; 35 mph) Complement 165 Sensors and processing systems OYQ-9 CDS (w/ Link-11) OYQ-103 ASWCS FCS-2-31 fire-control systems OPS-24B air search radar...
9 KB (650 words) - 16:57, 9 May 2023
Warfare (AAW) capability, with an OYQ-11 advanced Combat Direction Sub-system (CDS) and FCS-3A AAW weapon sub-system. OYQ-11 This is the first CDS adopting...
9 KB (602 words) - 22:33, 18 January 2024
as the second dispatch information gathering activity water squadron. On 9 June, the same year after arriving at the site, he took over the mission from...
8 KB (543 words) - 19:34, 15 April 2023
(56 km/h; 35 mph) Complement 165 Sensors and processing systems OYQ-9 CDS (w/ Link-11) OYQ-103 ASWCS FCS-2-31 fire-control systems OPS-24B air search radar...
7 KB (484 words) - 06:43, 23 April 2024
(56 km/h; 35 mph) Complement 165 Sensors and processing systems OYQ-9 CDS (w/ Link-11) OYQ-103 ASWCS FCS-2-31 fire-control systems OPS-24B air search radar...
7 KB (429 words) - 13:54, 22 February 2024
Mitsubishi Heavy Industries at Nagasaki as part of the 1995 plan and launched on 9 September 1998. Commissioned on 15 March 2000, the destroyer was incorporated...
10 KB (759 words) - 03:25, 20 January 2023
October 2022. "Archived copy" (PDF). Archived from the original (PDF) on 9 June 2020. Retrieved 1 November 2020.{{cite web}}: CS1 maint: archived copy...
8 KB (617 words) - 13:56, 16 September 2023