• Thumbnail for Regideso
    The Régie de Distribution d'Eau, abbreviated as REGIDESO, is a state-owned utility company located on Boulevard Du 30 Juin, in the Gombe commune of Kinshasa...
    33 KB (3,288 words) - 13:04, 6 September 2024
  • Thumbnail for REGIDESO Burundi
    3°23′13″S 29°21′41″E / 3.386919°S 29.3615087°E / -3.386919; 29.3615087 REGIDESO Burundi (French: Régie de Production et de Distribution d’eau et d’électricité...
    11 KB (1,256 words) - 19:05, 26 August 2024
  • in the Bururi Province of Burundi. The project is being undertaken for REGIDESO Burundi, part of the Ministry of Hydraulics, Energy and Mines. It includes...
    9 KB (816 words) - 14:00, 18 August 2024
  • Jiji and Murembwe Hydroelectric Project. It will be owned and operated by REGIDESO Burundi, part of the Ministry of Hydraulics, Energy and Mines. The Jiji...
    5 KB (354 words) - 14:06, 18 August 2024
  • de la Regideso et au Proseceau (PDF) (in French), REGIDESO, November 2013, retrieved 2024-08-19 Rapport Annuel 2016 (PDF) (in French), Regideso, retrieved...
    5 KB (404 words) - 17:17, 19 August 2024
  • Thumbnail for Kinshasa
    are normal, and exposed lines sometimes electrify pools of rainwater. Regideso, the national public company with primary responsibility for water supply...
    132 KB (11,701 words) - 23:21, 3 September 2024
  • Thumbnail for List of companies of the Democratic Republic of the Congo
    noted as defunct. Office National des Transports head office in Kinshasa Regideso building in Kinshasa Congo Railway's first train arrives in Kindu in 2004...
    10 KB (430 words) - 20:00, 15 October 2023
  • Jiji and Murembwe Hydroelectric Project. It will be owned and operated by REGIDESO Burundi, part of the Ministry of Hydraulics, Energy and Mines. The Mulembwe...
    4 KB (373 words) - 14:06, 18 August 2024
  • potential to expand to 2.8 MW as demand grew in the southern grid. In 2009 REGIDESO Burundi, the water and electricty authority, announced bids to rehabilitate...
    4 KB (228 words) - 14:24, 19 August 2024
  • 3 MWh of power annually. It was implemented in 1984 and is operated by REGIDESO Burundi. It was designed to supply electricity to the Muyinga and Cankuzo...
    6 KB (427 words) - 18:01, 6 September 2024