• Thumbnail for Semmering Base Tunnel
    The Semmering Base Tunnel is a railway tunnel under construction between Gloggnitz and Mürzzuschlag in Austria underneath the Semmering Pass. The existing...
    13 KB (1,324 words) - 05:35, 15 June 2024
  • Thumbnail for High-speed rail in Austria
    Retrieved 2021-12-31. red, steiermark ORF at/Agenturen (2021-02-18). "Semmering-Basistunnel erst ab 2028 in Betrieb". steiermark.ORF.at (in German). Retrieved...
    8 KB (637 words) - 14:17, 7 August 2024
  • Thumbnail for Marti Group
    Wammerl, Patrick (27 April 2021). "Semmering-Basistunnel: Sechseinhalb Jahre Haft für Betrug auf Baustelle" [Semmering Base Tunnel: Six and a half years...
    15 KB (1,310 words) - 21:35, 4 June 2024
  • Thumbnail for List of longest tunnels
    des Semmering-Basistunnels". Archived from the original on 28 January 2023. Retrieved 25 July 2023. "ÖBB Infrastruktur AG: 2014_01_10_Semmering-Basistunnel...
    136 KB (4,025 words) - 22:33, 8 September 2024
  • Thumbnail for Austrian Federal Railways
    Austrian railway network are the construction of the Koralm Railway, the Semmering Base Tunnel and the Brenner Base Tunnel connection with Italy. Eurobarometer...
    22 KB (1,964 words) - 20:27, 5 September 2024
  • January–March 1960. Retrieved 9 February 2013. "ÖBB: Gute Aussichten für Semmering-Basistunnel". Die Bundesbahn (in German) (8): 541. 1983. "Neubaustrecke Wien...
    25 KB (3,251 words) - 03:48, 28 August 2024
  • Genova". "Geologische Störzone führt zu späterer Fertigstellung des Semmering-Basistunnels". "webuild". www.webuildgroup.com. Retrieved 2022-04-11. https://www...
    66 KB (1,967 words) - 12:28, 26 August 2024
  • Thumbnail for Brenner Railway
    Amministrazione trasparente Galleria di Base del Brennero - Brenner Basistunnel BBT SE. Retrieved 1 January 2016. Facchinelli, L. (1995), La ferrovia...
    12 KB (1,300 words) - 08:20, 17 August 2024
  • Thumbnail for Brenner Pass
    not a barrier. [1] [dead link] Galleria di Base del Brennero – Brenner Basistunnel BBT SE – Offline Archived 22 December 2005 at the Wayback Machine "Governors...
    15 KB (1,772 words) - 07:23, 20 August 2024
  • "SAINT-JEAN-DE-MAURIENNE. Les travaux du Lyon-Turin débutent le 15 janvier". "Brenner Basistunnel zur Hälfte ausgebrochen: Baufortschritt läuft nach Plan". 29 November...
    57 KB (2,098 words) - 12:52, 20 August 2024