• Awakeri is a village located southwest of Whakatāne in the Bay of Plenty region of New Zealand's North Island. It is located in a farming and fruit-growing...
    10 KB (962 words) - 06:49, 28 October 2024
  • Thumbnail for Golf cart
    carrying passengers at up to 25 km/h (16 mph) on several former railways. Awakeri Rail Adventures operate carts on a 10 km (6.2 mi) part of the former Tāneatua...
    18 KB (2,114 words) - 07:40, 30 October 2024
  • Thumbnail for State Highway 30 (New Zealand)
    and through Te Teko, across the Rangitaiki River, to Awakeri. After crossing SH 2 at Awakeri, the highway turns north and heads towards the coast. The...
    9 KB (592 words) - 19:59, 25 August 2024
  • tramway operated as an extension of the Whakatane Board Mills Line from Awakeri to the Whakatane Board Mill near Whakatane, until its closure in 1966....
    6 KB (666 words) - 07:38, 13 April 2024
  • Thumbnail for Kids' Lit Quiz
    held on 4 July at the University of Auckland, New Zealand. The winner was Awakeri Primary School from the Bay of Plenty, New Zealand. The 2013 world final...
    7 KB (907 words) - 00:21, 14 August 2024
  • Thumbnail for Hot springs in New Zealand
    Motuoapa near Tūrangi Waingaro Wairakei Waiwera, near Orewa Whakatāne (Awakeri springs) Whitianga (The Lost Spring) Hanmer Springs Hurunui River Maruia...
    4 KB (322 words) - 16:38, 21 August 2024
  • to the short length of line between the mill and the NZR connection at Awakeri and were repainted from the original black with yellow trim into a white...
    50 KB (2,429 words) - 07:27, 25 July 2024
  • Thumbnail for Whakatāne
    company's mill on the western side of the river to the Taneatua Branch line at Awakeri. The Whakatane Board Mills Line was freight only, with no passenger service...
    39 KB (3,175 words) - 06:50, 28 October 2024
  • opened in 1937 as a tramway, connecting to the NZR East Coast Main Trunk at Awakeri. Initially, the line carried materials for constructing the Whakatane Board...
    5 KB (496 words) - 03:02, 8 January 2024
  • Alliance is carrying out rural work on SH 1 (Waikato Expressway, Te Teko-Awakeri), SH 1B (Taupiri-Gordonton), SH 3 (Ohaupo-Te Awamutu, Waitomo-Te Kuiti)...
    23 KB (2,353 words) - 23:48, 8 October 2024