• Thumbnail for IRIS-T
    IRIS-T (section IRIS-T SLM)
    IRIS-T SLS fielded in 2015, and the medium-range IRIS-T SLM fielded in 2022. One IRIS-T SLM battery, as supplied by Germany to Ukraine, consists of three...
    78 KB (7,568 words) - 03:00, 13 November 2024
  • Thumbnail for Ida Does
    hulp aan nabestaanden SLM-ramp: 'Voor velen moet de klap nog komen'" [Social Worker Ida Chin-A-Loi on Aid to Relatives for the SLM Disaster: "For many the...
    12 KB (1,075 words) - 02:36, 8 September 2024
  • Thumbnail for Bern-Lötschberg-Simplon-Bahn
    Maschinenfabrik Oerlikon SAAS = Société Anonyme des Ateliers de Sécheron, Geneva SLM = Swiss Locomotive and Machine Works, Winterthur The BLS was engaged in the...
    22 KB (2,119 words) - 22:08, 29 October 2024
  • Merged with Singapore Airlines 6Q SLL Slovak Airlines SLOV LINE Slovakia PY SLM Surinam Airways SURINAM Suriname SLN Sloane Aviation SLOANE United Kingdom...
    3 KB (795 words) - 00:36, 18 July 2024
  • Thumbnail for Surinam Airways Flight 764
    failure of SLM's (Surinam Airways) operational management to observe the pertinent regulations as well as the procedures prescribed in the SLM Operations...
    17 KB (1,859 words) - 13:26, 8 November 2024
  • Thumbnail for List of military aid to Ukraine during the Russo-Ukrainian War
    Minister warns Russian threat to global stability is accelerating as Putin ramps up attacks on Black Sea". GOV.UK. 23 October 2024. Retrieved 26 October...
    549 KB (25,516 words) - 14:32, 11 November 2024
  • non-Arab Sudan Liberation Movement and Justice and Equality Movement, after SLM and JEM launched attacks against the Sudanese government and accusing them...
    99 KB (9,121 words) - 16:39, 11 October 2024
  • 1A5 main battle tanks, 20 armored infantry fighting vehicles, four IRIS-T SLM air defense systems, 100 armored fighting vehicles, and 200 drones. On 31...
    318 KB (29,041 words) - 15:28, 9 November 2024
  • (2017-01-25). "West Michigan coffee factory to produce 75M cans in 2017, ramp up hiring". mlive. Retrieved 2023-12-16. Szkaradnik, Carly (2015-04-30)....
    17 KB (1,507 words) - 00:08, 27 September 2024
  • Thumbnail for Monte Generoso railway
    electrified and four twin-unit railcars (Bhe 4/8 11 to 14) were supplied by SLM in 1981-2. At the end of the season in 2013, the line closed for the winter...
    14 KB (1,202 words) - 13:16, 4 June 2021