• Thumbnail for Neptun Werft
    Neptun Werft (German pronunciation: [ˈnɛptuːn ˌvɛːʁft] ; English: Neptun shipyard) is a German shipbuilding company, headquartered in Rostock. Since 1997...
    6 KB (492 words) - 12:29, 30 August 2024
  • generations. Since 1997, it has been part of the Meyer Neptun Group, together with Neptun Werft in Rostock. In 2014, the company added the Turku shipyard...
    12 KB (983 words) - 12:31, 30 August 2024
  • Thumbnail for Icon of the Seas
    announced that the first LNG tank for the ship was installed at the Neptun Werft in Rostock, Germany. In December 2021, the floating engine room unit...
    22 KB (1,539 words) - 20:15, 26 August 2024
  • ordered another ship from Neptun Werft. The delivery is scheduled for March 2025. Nine more ships are ordered at Meyer Werft for delivery in 2025 and 2026...
    67 KB (3,390 words) - 16:15, 29 August 2024
  • Thumbnail for Disney Treasure
    built at Neptun Werft, Rosrock and was trasfered to Meyer Werft later. On March 30, 2023, the keel laying ceremony occurred at Meyer Werft with the keel...
    15 KB (1,427 words) - 14:59, 26 August 2024
  • with Meyer Werft. The hulls are built by Neptun Werft in Warnemünde, which is part of the Meyer Group, the superstructure at Meyer Werft, Papenburg....
    6 KB (472 words) - 13:15, 21 August 2024
  • Thumbnail for RV Meteor (1986)
    Werft and Fassmer in 2022 to replace the Meteor and the Poseidon, which has already been retired, in 2026.The Keel was laid on 11 July 2023 at Neptun...
    11 KB (714 words) - 11:02, 10 August 2024
  • Thumbnail for A-Rosa Flora
    cruise ship, cruising in the Rhine – Main – Danube basin. It was built by Neptun Werft GmbH at their shipyard in Warnemünde, Germany, and entered service in...
    3 KB (113 words) - 20:15, 2 May 2022
  • Thumbnail for List of active German Navy ships
    Type 707 2  Germany – Combat Support Ship NVL Group (design) Meyer Werft Neptun Werft – – 2025 20,000 tonnes Successor of the Type 704 Rhön class – – 2025...
    43 KB (830 words) - 11:41, 26 August 2024
  • Thumbnail for MS Iona
    the LNG tanks for Iona was constructed separately at Meyer Werft's sister yard, Neptun Werft, in Rostock. On 27 October 2016, P&O announced that the public...
    18 KB (1,658 words) - 14:56, 10 August 2024