• Thumbnail for Herrnhütte station
    Herrnhütte station is a Nuremberg U-Bahn station, located on the U2. "Tarifzonenplan: Nürnberg, Fürth" (PDF). Verkehrsverbund Großraum Nürnberg. 1 January...
    2 KB (29 words) - 04:26, 30 July 2024
  • Thumbnail for U2 (Nuremberg U-Bahn)
    Rathenauplatz ↔ Schoppershof 27 January 1996: Schoppershof ↔ Herrnhütte 27 November 1999: Herrnhütte ↔ Flughafen As the construction of U2 neared its end, debates...
    19 KB (2,238 words) - 12:06, 7 August 2024
  • Thumbnail for Ziegelstein station
    Line(s) Tracks 2 Connections Bus 21 Ziegelstein - Buchenbühl 22 Thon - Herrnhütte Construction Structure type Underground Other information Fare zone VGN:...
    3 KB (195 words) - 03:31, 29 July 2024
  • Thumbnail for Nuremberg U-Bahn
    7.5 km Rennweg 8.1 km Schoppershof 9.0 km Nordostbahnhof Nuremberg Ring Railway 9.9 km Herrnhütte to Gräfenberg 10.8 km Ziegelstein 13.2 km Flughafen...
    53 KB (6,822 words) - 09:18, 31 July 2024
  • Thumbnail for Nordostbahnhof station
    1996. It is 902m from Schoppershof underground station and 835m from Herrnhütte underground station. The station is connected to Rottenbach by a sharp...
    7 KB (475 words) - 02:36, 29 July 2024
  • Thumbnail for Nuremberg Airport
    for the 85 million DM construction cost of the 945 m (3,100 ft) stretch Herrnhütte-Ziegelstein. According to press reports approximately 30 million passengers...
    97 KB (7,524 words) - 19:57, 23 July 2024
  • Thumbnail for List of Nuremberg U-Bahn stations
    2008 Terminus of U2 1988–1990 Hardhöhe U1 8 December 2007 Terminus of U1 Herrnhütte U2 27 January 1996 Terminus of U2 1996–1999 Hohe Marter U2 27 September...
    6 KB (44 words) - 01:58, 15 February 2024
  • Thumbnail for Flughafen station
    track is used for passenger service. Construction of the extension from Herrnhütte started in September of 1996 and cost 180 million Deutsche Mark (equivalent...
    8 KB (734 words) - 01:04, 29 July 2024