• Thumbnail for MAN SE
    "Maschinenfabrik Augsburg". The branch Süddeutsche Brückenbau A.G. (MAN-Werk Gustavsburg) was founded when the company in 1859 was awarded the contract for...
    23 KB (2,402 words) - 05:16, 5 March 2024
  • Thumbnail for Ginsheim-Gustavsburg
    firm Klett & Co. (which later became MAN-Werk Gustavsburg branch of nowadays Maschinenfabrik Augsburg-Nürnberg, or MAN) began building work on a bridge across...
    10 KB (1,088 words) - 02:47, 13 February 2024
  • Thumbnail for Wuppertal Schwebebahn
    sections. When the line was originally built, Anton Rieppel, head of MAN-Werk Gustavsburg, designed the structural system, which he patented. At each end of...
    29 KB (2,985 words) - 12:15, 12 April 2024
  • Thumbnail for Ludendorff Bridge
    construction companies Grün & Bilfinger with the steel bridge built by MAN-Werk Gustavsburg. It was one of three bridges built to improve railroad traffic between...
    22 KB (2,366 words) - 03:29, 1 April 2024
  • railway bridge over the Rhine river constructed and assembled by MAN-Werk Gustavsburg was finished, a train ferry operated on the river. In Mainz the line...
    13 KB (977 words) - 20:04, 22 July 2022
  • Thumbnail for Südbrücke, Mainz
    Railway that connects Mainz, Rhineland-Palatinate, across the Rhine with Gustavsburg in Hesse. It is one of the early railway bridges in Germany. In the period...
    5 KB (442 words) - 07:53, 16 February 2024
  • Thumbnail for München Hauptbahnhof
    to the basement and the two open shops by a newly installed wall. A BackWerk self-service bakery was also built in this newly created corridor. Most passengers...
    86 KB (7,516 words) - 13:21, 2 July 2024
  • Thumbnail for Heinrich Gerber (civil engineer)
    in Maschinenbau-Actiengesellschaft Nürnberg, in 1873, the plant MAN-Werk Gustavsburg and his Munich office was merged to Süddeutsche Bridge AG in Munich...
    4 KB (489 words) - 09:13, 10 November 2023
  • Thumbnail for Rhine Bridge, Germersheim (railway)
    beam in the longitudinal direction was built by a joint venture of MAN Werk Gustavsburg and the Aug. Klönne company. The 268 m-long construction has 66 m-long...
    5 KB (546 words) - 18:07, 13 February 2024
  • Thumbnail for Hessian Ludwig Railway
    station) until a newly designed Rhine bridge was constructed by MAN-Werk Gustavsburg and given to traffic on 1 of December 1862. This line not only connected...
    11 KB (1,323 words) - 22:07, 13 November 2020