• The AP1000 is a nuclear power plant designed and sold by Westinghouse Electric Company. The plant is a pressurized water reactor with improved use of passive...
    59 KB (6,009 words) - 19:31, 5 October 2024
  • of Cranberry Township, Pennsylvania. The company's main product is the AP1000, a modern pressurized water reactor (PWR) design with many passive safety...
    45 KB (4,412 words) - 19:40, 11 October 2024
  • Thumbnail for Khmelnytskyi Nuclear Power Plant
    are operational, each generating 1000 MW (net) of electricity, with two AP1000 reactors under construction. Khmelnytskyi Nuclear Power Plant is connected...
    9 KB (777 words) - 00:54, 25 September 2024
  • Thumbnail for Nuclear power in China
    Westinghouse AP1000 was planned to be the main basis of China's move to Generation III technology. In July 2018, the first of four AP1000 reactors was...
    67 KB (5,992 words) - 00:51, 16 October 2024
  • coming online from 2024 with 3.4 GW of new nuclear capacity, from three AP1000 reactors. Work up to 2018 would include acquiring the site licence, the...
    22 KB (2,169 words) - 13:33, 1 November 2023
  • Thumbnail for Pressurized water reactor
    reactor evolutionary designs: the AP1000, VVER-1200, ACPR1000+, APR1400, Hualong One, IPWR-900 and EPR. The first AP1000 and EPR reactors were connected...
    33 KB (4,295 words) - 11:01, 16 October 2024
  • has been scaled up and improved with the AP1000. Certification testing and analysis of the AP600 and AP1000 reactor designs for Westinghouse were conducted...
    2 KB (192 words) - 21:17, 29 September 2022
  • Thumbnail for Virgil C. Summer Nuclear Generating Station
    Virgil C. Summer Nuclear Generating Station (category Nuclear power stations using AP1000 reactors)
    Electric and Gas was also in the process of constructing two Westinghouse AP1000 plants, which had been scheduled to go into service in 2020, but construction...
    27 KB (1,869 words) - 10:08, 16 August 2024
  • Thumbnail for Generation III reactor
    Power Station (first grid connection on 2018-06-29) and a Westinghouse AP1000 reactor at the Sanmen Nuclear Power Station (first grid connection on 2018-06-30)...
    33 KB (1,700 words) - 09:41, 4 September 2024
  • Thumbnail for Sanmen Nuclear Power Station
    Sanmen Nuclear Power Station (category Nuclear power stations using AP1000 reactors)
    Sanmen County, Zhejiang, China. Sanmen is the first implementation of the AP1000 pressurized water reactor (PWR) developed by Westinghouse Electric Company...
    18 KB (1,365 words) - 21:04, 16 April 2024