DescriptionResponse Boat Medium 45 (2296554504).jpg
Washington (Feb. 26, 2007-- The Coast Guard announced plans for operational evaluation & testing (OT&E) of the response boat medium (RB-M). On June 21, 2006, the Coast Guard Awarded a Contract to Marinette Marine Corporation (MMC) for the detailed design and production of the 45-ft. RB-M with the goal of building approximately 180 45-ft. RB-M's to replace the 41ft UTB's and other non-standard UTM's at stations. The award was the culmination of an extensive effort to provide the Coast Guard with the right boat to meet current and future mission activities. The detailed design is complete and on June 28, 2007 the keel was laid for the first 45-ft. RB-M marking the start of Low Rate Initial Production (LRIP). Photo courtesy of Marinette Marine Corp.
to share – to copy, distribute and transmit the work
to remix – to adapt the work
Under the following conditions:
attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
https://creativecommons.org/licenses/by/2.0CC BY 2.0 Creative Commons Attribution 2.0 truetrue
This file contains additional information, probably added from the digital camera or scanner used to create or digitize it.
If the file has been modified from its original state, some details may not fully reflect the modified file.
Image title
Washington (Feb. 26, 2007-- The Coast Guard announced plans for operational evaluation & testing (OT&E) of the response boat medium (RB-M). On June 21, 2006, the Coast Guard Awarded a Contract to Marinette Marine Corporation (MMC) for the detailed design and production of the 45-ft. RB-M with the goal of building approximately 180 45-ft. RB-M's to replace the 41ft UTB's and other non-standard UTM's at stations. The award was the culmination of an extensive effort to provide the Coast Guard with the right boat to meet current and future mission activities. The detailed design is complete and on June 28, 2007 the keel was laid for the first 45-ft. RB-M marking the start of Low Rate Initial Production (LRIP). Photo courtesy of Marinette Marine Corp.