Mexican Federal Highway 47D
Federal Highway 47D | |
---|---|
Carretera federal 47D | |
Macrolibramiento Palmillas-Apaseo el Grande Libramiento Centenario de la Constitución de 1917 | |
Route information | |
Maintained by Empresas ICA | |
Length | 90 km[1] (56 mi) |
Existed | May 18, 2017–present |
Major junctions | |
East end | Fed. 45 at Palmillas, Querétaro |
Fed. 57D / Fed. 57 at Palmillas, Querétaro Fed. 120 near Amealco de Bonfil, Querétaro Fed. 45 at Apaseo el Alto, Guanajuato | |
West end | Fed. 45D at Apaseo el Grande, Guanajuato |
Location | |
Country | Mexico |
Highway system | |
The Macrolibramiento Palmillas-Apaseo el Grande, also known as the Libramiento Centenario de la Constitución de 1917 (Centennial of the Constitution of 1917 Bypass), is a toll highway in the Mexican states of Querétaro and Guanajuato, designed to serve as a large-scale bypass of Querétaro City and San Juan del Río, signed as Mexican Federal Highway 47D. It is operated by Empresas ICA and carries a toll of 75 pesos per car and 37 pesos per motorcycle.[2]
History
[edit]In 2012, ICA, member of the consortium Controladora de Operaciones de Infraestructura, S.A. de C.V.,[3] obtained a 30-year[4] concession for the highway from Palmillas to Apaseo el Grande. This project was conceived in order to connect the Bajío region, home of an increasing number of industrial parks that generate truck traffic, to Mexico City without traversing Querétaro City and in less time;[1] it was also considered the third-most important highway project of Enrique Peña Nieto's presidency[5] and the most important for central Mexico.[6]
Construction began in April 2013;[3] while originally planned for completion in 2015,[7] the road faced delays due to difficulties acquiring the road's right-of-way[4] as well as with funding from the federal government and the higher cost of materials due to the weakness of the Mexican peso.[8]
On May 15, 2017, the SCT announced that the highway was complete; it cost 5.755 billion pesos to build.[1] Three days later, President Peña Nieto visited San Juan del Río to formally inaugurate the new highway.[5] It is expected to carry 15,000 to 17,000 cars a day, reducing the load on Mexican Federal Highway 57D which carries 60,000 vehicles a day.[1][5] From May 22 to May 26, Caminos y Puentes Federales charged a discounted "promotional" toll on the road in order to recover lost revenues from traffic loss on Highway 57D until ICA took over operation of the toll booths on May 27.[2]
While the highway's mainline is complete, work is still in progress to build the road's nine interchanges and auxiliary toll booths that will connect the bypass to towns such as Amealco de Bonfil and Huimilpan.[5] In addition to nine interchanges, the highway also features 23 underpasses, nine overpasses and 15 bridges.[9]
Route description
[edit]The four-lane Macrolibramiento Palmillas-Apaseo el Grande passes through six municipalities, four in Querétaro and two in Guanajuato.[6] The road begins at an interchange with Mexican Federal Highway 45; shortly thereafter traffic headed for Celaya from Mexico City splits off from Mexican Federal Highway 57D at Palmillas, and immediately after is a full cloverleaf with Mexican Federal Highway 57, leading to Atlacomulco, State of Mexico, to the south. Two interchanges serve Amealco de Bonfil, including one with Mexican Federal Highway 120 at kilometer 31. At kilometer 46 is an exit serving Huimilpan. After the interchange to Coroneo at kilometer 63, the highway crosses from Querétaro into Guanajuato in Apaseo el Alto, where it boasts an interchange with Mexican Federal Highway 45; the mainline ends at Highway 45D in Apaseo el Grande.[10]
References
[edit]- ^ a b c d Notimex (16 May 2017). "Finalizan las obras macrolibramiento Palmillas-Apaseo el Grande". Obrasweb. Retrieved 18 May 2017.
- ^ a b Contreras, Alan (25 May 2017). "Esto costará usar el Libramiento Palmillas-Apaseo el Grande". El Financiero. Retrieved 25 May 2017.
- ^ a b "Iniciarán trabajos de nueva carretera". El Universal Querétaro. 14 April 2013. Retrieved 18 May 2017.
- ^ a b Contreras, Alan (24 March 2017). "Derecho de vía atrasó el Libramiento Palmillas- Apaseo: ICA". El Financiero. Retrieved 18 May 2017.
- ^ a b c d "Inauguran hoy el libramiento Palmillas-Apaseo el Grande". El Sol del Bajío. 18 May 2017. Retrieved 18 May 2017.
- ^ a b Agencia Reforma (27 March 2017). "Meten lupa a ICA por carretera Palmillas-Apaseo el Grande". Periódico Correo. Retrieved 18 May 2017.
- ^ Meza, Pepe (24 January 2014). "Construcción del libramiento Apaseo el Grande-Palmillas registra avance de 15% : SCT". Grupo Informativo Así Sucede. Retrieved 18 May 2017.
- ^ Contreras, Guillermo (15 September 2015). "Postergan la conclusión del libramiento Apaseo-Palmillas". AM Querétaro. Retrieved 18 May 2017.
- ^ Porras Lara, Rosa Emilia (16 May 2017). "Casi listo el macro libramiento de Querétaro". Milenio.
- ^ "Libramiento de Querétaro – Carretera Palmillas-Apaseo el Grande". Retrieved 18 May 2017.