Liudao Kou station

Liudao Kou[1]

六道口
Beijing Subway
Line 15 platform

Changping line platform
General information
LocationQinghua East Road (清华东路) and Xueyuan Road (学院路) / Xueqing Road
Haidian District, Beijing
China
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Line 15
     Changping line
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
OpenedDecember 28, 2014; 9 years ago (2014-12-28)
(Line 15)
February 4, 2023; 20 months ago (2023-02-04) (Changping line)[2]
Services
Preceding station Beijing Subway Following station
Qinghua Donglu Xikou
Terminus
Line 15 Beishatan
towards Fengbo
Xuezhiyuan Changping line Xueyuanqiao
towards Xitucheng
Location
Liudao Kou[1] is located in Beijing
Liudao Kou[1]
Liudao Kou[1]
Location in central Beijing

Liudao Kou station[1] (Chinese: 六道口站; pinyin: Liùdàokǒu zhàn) is an interchange station on Line 15 and Changping line of the Beijing Subway. The station for Line 15 was opened on December 28, 2014.[3] The station for Changping line opened on February 4, 2023.[2]

Station layout

[edit]

The station has underground island platforms for both Line 15 and Changping line.

Exits

[edit]

There are 7 exits, lettered A1, A2, B, C, D, E and F. Exits C, D and E are accessible via elevators.

Station art

[edit]

A curved wall inside the transfer channel of this station is decorated with a mural named 'Flowers Like Brocade', and the Changping line station hall and transfer node are decorated with a mural named 'Growth' that embodies 'trees and the people who plant trees'.[4]

[edit]

References

[edit]
  1. ^ a b "北京地铁线路图". 北京地铁. Archived from the original on 2021-12-31.
  2. ^ a b "2月4日首班车起昌平线南延一期开通试运营". 2023-02-02.
  3. ^ "Beijing opens four new subway lines". Xinhua. Retrieved 28 December 2014.
  4. ^ "北京轨道交通昌平线南延公共空间艺术品方案(公示稿)" (PDF). 北京市规划和自然资源委员会. 2022-12-06. Retrieved 2023-01-18.
[edit]

40°00′04″N 116°21′03″E / 40.0011°N 116.3509°E / 40.0011; 116.3509